Treasure Chest Casino Parking Lots
Size of Project
9 Acres
Location
Kenner, LA
Owner
Boyd Gaming
Industry
Infrastructure
Status
Completed in 2024
Overview
Paving the way for a new casino.
The RNGD Infrastructure team partnered with W.G. Yates Construction on Boyd Gaming’s Treasure Chest Casino project in Kenner, LA. RNGD delivered a complete site package across two phases of work, beginning with the construction of a remote parking lot and followed by full sitework for the new casino building. RNGD self-performed mass grading, excavation, demolition, and utility installation and relocation. The scope also included exporting unsuitable soils and importing engineered fill to achieve the required substructure conditions.
Remote Parking
- 9 Acre Lot Site
- 4 Acres of Paving
- (172,500 SF)
- 1,000 LF Storm Drain
- 900 LF Fire Water Main
- 1400 LF Domestic Water Line
- 3,000 LF Curb and Gutter
- 5,100 SF Concrete Sidewalk
- 114,000 CY Earthmoving (import, export)
- Detention Pond
- $4,000,000
- 60 Day Schedule
Main Site
- 12 Acres of Asphalt Paving Removal
- 30,000 CY of Earthwork
- 23,000 Tons of Limestone Base
- 5,000 LF of Storm Drainage
- 3800 LF of Water Main
- 1400 LF of Sewer Force Main
- Sewer Lift Station
- Detention Ponds
- $4,000,000